<?xml version="1.0" encoding="utf-8" ?>
<?xml-stylesheet type="text/xsl" href="RSS_xslt_style.asp" version="1.0" ?>
<rss version="2.0" xmlns:WebWizForums="http://syndication.webwiz.co.uk/rss_namespace/">
 <channel>
  <title>Middletown Forum : Breiel Boulevard Project</title>
  <link>http://www.middletownusa.com/forum/</link>
  <description>This is an XML content feed of; Middletown Forum : Community Revitalization : Breiel Boulevard Project</description>
  <pubDate>Tue, 06 Oct 2026 19:28:38 +0000</pubDate>
  <lastBuildDate>Wed, 25 Nov 2009 09:11:12 +0000</lastBuildDate>
  <docs>http://blogs.law.harvard.edu/tech/rss</docs>
  <generator>Web Wiz Forums 10.12</generator>
  <ttl>360</ttl>
  <WebWizForums:feedURL>www.middletownusa.com/forum/RSS_post_feed.asp?TID=2364</WebWizForums:feedURL>
  <image>
   <title>Middletown Forum</title>
   <url>http://middletownusa.com/images/blog-logo.jpg</url>
   <link>http://www.middletownusa.com/forum/</link>
  </image>
  <item>
   <title>Breiel Boulevard Project :   wasteful wrote: Photographs...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=2364&amp;PID=14181&amp;title=breiel-boulevard-project#14181</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=216">randy</a><br /><strong>Subject:</strong> 2364<br /><strong>Posted:</strong> Nov&nbsp;25&nbsp;2009 at 9:11am<br /><br /><table width="99%"><tr><td class="BBquote"><img src="forum_images/quote_box.png" title="Originally posted by wasteful" alt="Originally posted by wasteful" style="vertical-align: text-bottom;" /> <strong>wasteful wrote:</strong><br /><br /><P>Photographs are in order.<img src="http://www.middletownusa.com/forum/smileys/smiley4.gif" height="17" width="17" border="0" alt="Big%20smile" /></P></td></tr></table> <DIV></DIV><DIV></DIV><DIV>&nbsp;</DIV><DIV>&nbsp;</DIV><DIV>Working on it my friend, will get them today and post&nbsp;them later tonight. </DIV>]]>
   </description>
   <pubDate>Wed, 25 Nov 2009 09:11:12 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=2364&amp;PID=14181&amp;title=breiel-boulevard-project#14181</guid>
  </item> 
  <item>
   <title>Breiel Boulevard Project : Photographs are in order. </title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=2364&amp;PID=14179&amp;title=breiel-boulevard-project#14179</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=358">wasteful</a><br /><strong>Subject:</strong> 2364<br /><strong>Posted:</strong> Nov&nbsp;25&nbsp;2009 at 9:06am<br /><br /><P>Photographs are in order.<img src="http://www.middletownusa.com/forum/smileys/smiley4.gif" height="17" width="17" border="0" alt="Big%20smile" /></P>]]>
   </description>
   <pubDate>Wed, 25 Nov 2009 09:06:13 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=2364&amp;PID=14179&amp;title=breiel-boulevard-project#14179</guid>
  </item> 
  <item>
   <title>Breiel Boulevard Project : Here is what City Manager Judy...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=2364&amp;PID=14177&amp;title=breiel-boulevard-project#14177</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=216">randy</a><br /><strong>Subject:</strong> 2364<br /><strong>Posted:</strong> Nov&nbsp;25&nbsp;2009 at 8:51am<br /><br /><DIV>Here is what&nbsp; City Manager Judy Gillenland had to say about the Breiel Boulevard Project. </DIV><DIV>&nbsp;</DIV><DIV>&nbsp;</DIV><DIV>&nbsp;</DIV><DIV>We will be bringing a change order to City Council in December 1st for approximately $90,000 for the Breiel Blvd Project as well.&nbsp; The additional cost was incurred due to additional catch basin repairs, larger water services at various locations, and primarily some needed subgrade repairs (including cement stabilization north of Nelson). Approximately $20,000 will come from the utility funds and these funds are currently available.&nbsp; The remaining $70,000 will require a supplemental appropriation from the CIP.</DIV><P><strong>The road is open and looks beautiful – and smooth!&nbsp; The remaining items include a traffic pole and associated median concrete which may not be completed until mid December due to delivery dates.</strong></P><DIV></DIV><DIV></DIV>Taken from the <FONT size=2><a href="http://www.middletownusa.com/view_news.asp?a=4774" target="_blank">Weekly Update to City Council from the City Manager November 22, 2009<BR></A>&nbsp; <BR></FONT>]]>
   </description>
   <pubDate>Wed, 25 Nov 2009 08:51:18 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=2364&amp;PID=14177&amp;title=breiel-boulevard-project#14177</guid>
  </item> 
 </channel>
</rss>