<?xml version="1.0" encoding="utf-8" ?>
<?xml-stylesheet type="text/xsl" href="RSS_xslt_style.asp" version="1.0" ?>
<rss version="2.0" xmlns:WebWizForums="http://syndication.webwiz.co.uk/rss_namespace/">
 <channel>
  <title>Middletown Forum : Orman Building Demo</title>
  <link>http://www.middletownusa.com/forum/</link>
  <description>This is an XML content feed of; Middletown Forum : Fun Pictures and Video : Orman Building Demo</description>
  <pubDate>Tue, 06 Oct 2026 01:55:22 +0000</pubDate>
  <lastBuildDate>Thu, 23 Aug 2012 11:05:03 +0000</lastBuildDate>
  <docs>http://blogs.law.harvard.edu/tech/rss</docs>
  <generator>Web Wiz Forums 10.12</generator>
  <ttl>360</ttl>
  <WebWizForums:feedURL>www.middletownusa.com/forum/RSS_post_feed.asp?TID=4714</WebWizForums:feedURL>
  <image>
   <title>Middletown Forum</title>
   <url>http://middletownusa.com/images/blog-logo.jpg</url>
   <link>http://www.middletownusa.com/forum/</link>
  </image>
  <item>
   <title>Orman Building Demo :   The hoe on the left is a Kobelco...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34505&amp;title=orman-building-demo#34505</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=259">409</a><br /><strong>Subject:</strong> 4714<br /><strong>Posted:</strong> Aug&nbsp;23&nbsp;2012 at 11:05am<br /><br />The hoe on the left is a Kobelco SK200. The Bobcat I referenced in an earlier post is actually a Mustang.<div><img src="uploads/259/IMG_2832.JPG" height="300" width="400" border="0" /></div>]]>
   </description>
   <pubDate>Thu, 23 Aug 2012 11:05:03 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34505&amp;title=orman-building-demo#34505</guid>
  </item> 
  <item>
   <title>Orman Building Demo :   Photo copied from 8/14/2012...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34504&amp;title=orman-building-demo#34504</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=101">Mike_Presta</a><br /><strong>Subject:</strong> 4714<br /><strong>Posted:</strong> Aug&nbsp;23&nbsp;2012 at 9:30am<br /><br /><img src="http://sphotos-a.xx.fbcdn.net/hphotos-ash4/s480x480/380400_452743858093598_933648278_n.jpg" height="298" width="398" border="0" /><div></div><div><font size="2">Photo copied from 8/14/2012 Facebook post by W. Pence, showing both backhoes.</font></div><div></div>]]>
   </description>
   <pubDate>Thu, 23 Aug 2012 09:30:43 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34504&amp;title=orman-building-demo#34504</guid>
  </item> 
  <item>
   <title>Orman Building Demo :         CHMoore,  Not...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34501&amp;title=orman-building-demo#34501</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=101">Mike_Presta</a><br /><strong>Subject:</strong> 4714<br /><strong>Posted:</strong> Aug&nbsp;23&nbsp;2012 at 8:59am<br /><br /><font size="3" face="Times New Roman"></font><p style="margin: 0in 0in 10pt;"><span style='line-height: 115%; font-family: "Arial","sans-serif"; font-size: 10pt;'>CHMoore,<?: prefix = o ns = "urn:schemas-microsoft-com:office:office" /><o:p></o:p></span></p><font size="3" face="Times New Roman"></font><p style="margin: 0in 0in 10pt;"><span style='line-height: 115%; font-family: "Arial","sans-serif"; font-size: 10pt;'>Not to nit-pick or to start an argument, but just toclarify: <o:p></o:p></span></p><font size="3" face="Times New Roman"></font><p style="margin: 0in 0in 10pt;"><span style='line-height: 115%; font-family: "Arial","sans-serif"; font-size: 10pt;'>There were actually TWO backhoes working thisproject.<span style="mso-spacerun: yes;">&nbsp; </span>The large Caterpillar and asmaller hoe (I can’t recognize the make—see the picture on the left posted by409 on14 Aug 2012 at 6:12pm). <o:p></o:p></span></p><font size="3" face="Times New Roman"></font><p style="margin: 0in 0in 10pt;"><span style='line-height: 115%; font-family: "Arial","sans-serif"; font-size: 10pt;'>I haven’t done any estimating since 1996 or ’97, but backthen your hourly rate figure would’ve been too high for the smaller hoe, andmaybe about right ($150 to 200, renting by the hour) for the big Cat).&nbsp; Your guess for inflation since 1997 is as good as mine (and&nbsp;probably better, if you've been doing estimating since then).<o:p></o:p></span></p><font size="3" face="Times New Roman"></font><p style="margin: 0in 0in 10pt;"><span style='line-height: 115%; font-family: "Arial","sans-serif"; font-size: 10pt;'>Also, the big hoe (the Cat) used a hydraulic shear, not abucket, part of the time.<span style="mso-spacerun: yes;">&nbsp; </span>There is an additionalrental/equipment usage charge for shears and/or hydraulic rams that can run ashigh as 50% of the charge for the hoe.<span style="mso-spacerun: yes;">&nbsp;</span>(Hard to believe, I know, but it is true.)<span style="mso-spacerun: yes;">&nbsp; </span>This second&nbsp;hoe also means that another operator is needed.<o:p></o:p></span></p><font size="3" face="Times New Roman"></font><p style="margin: 0in 0in 10pt;"><span style='line-height: 115%; font-family: "Arial","sans-serif"; font-size: 10pt;'>Finally, to be fair to the City Manager, I recall hersaying at the last council meeting that she wasn’t certain of the exact costbut was sure that it was LESS than $50,000.<span style="mso-spacerun: yes;">&nbsp;</span>Maybe it was way less???<span style="mso-spacerun: yes;">&nbsp; </span>Let’swait and see—hopefully it will be less than $25,000.<o:p></o:p></span></p><font size="3" face="Times New Roman"></font><p style="margin: 0in 0in 10pt;"><span style='line-height: 115%; font-family: "Arial","sans-serif"; font-size: 10pt;'><o:p>&nbsp;</o:p></span></p><font size="3" face="Times New Roman"></font>]]>
   </description>
   <pubDate>Thu, 23 Aug 2012 08:59:15 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34501&amp;title=orman-building-demo#34501</guid>
  </item> 
  <item>
   <title>Orman Building Demo :   Ground/Bill: I have experience...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34500&amp;title=orman-building-demo#34500</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=1018">chmoore1</a><br /><strong>Subject:</strong> 4714<br /><strong>Posted:</strong> Aug&nbsp;23&nbsp;2012 at 2:25am<br /><br />Ground/Bill:&nbsp; I have experience with "emergency" work.&nbsp; First, this wasn't really "emergency work"---they had several days to line this up.&nbsp; "Emergency" is, this water main broke and you need to respond within one hour, and stay on the job 24 hours a day until it is finished."&nbsp; Whatever it takes.&nbsp; Send me 10 men and let's go.&nbsp; By photo evidence, it started on the morning of August 14th.&nbsp; One hoe, one operator, one worker hosing the dust, and, perhaps, a third operating a front end loader.&nbsp; Apparently, whatever wasn't reclaimed (large beams) was dropped in the basement and not hauled off.&nbsp; Project was finished by 3:39, August 16th.&nbsp; No evidence of overnight work.&nbsp; So, hoe and operator at, say, $200.00/hr (hoe $125.00, operator $75.00/hr.)&nbsp; X&nbsp; 24 (8 X 3 days)&nbsp; equals $4,800.&nbsp; 24 hours labor for 2 other employees @ $50.00/hr. each equals $2,400.&nbsp; Move-in, move-out,&nbsp;4 hours (generous) @ $50.00/hr. equals $200.00.&nbsp; Misc. materials (plastic protective fencing, etc.)&nbsp; say, $2,000 to be generous equals $2,000.&nbsp; Water for hosing, let's say $1,000 to be generous (water might even have been supplied&nbsp;by the city at no charge).&nbsp;Even if some disposal was involved, let's again be generous and say $5,000.&nbsp; Let's see what we have: $4,800 + $2,400 + $200.00 + $2,000 + $1,000 +&nbsp;$5,000 = $15,400.&nbsp; Yeah, that really gets close to $50,000 real fast.&nbsp; Can you think of anything that was left out for $35,000?&nbsp;&nbsp; Also, don't forget that the city has to have an agreement with a demolition company to respond to this type of project relatively quickly.&nbsp; With as many buildings as the city has demolished recently, this should have been relatively routine.&nbsp; Just for the sake of argument, let's up the equipment cost&nbsp;to $200/hr., up $75/hr.&nbsp;X &nbsp;24 hours; add another $1,800.&nbsp; Total, $17,200.&nbsp;&nbsp;&nbsp;&nbsp;Uh, yeah, I did do project estimates for a number of years.&nbsp;&nbsp;&nbsp; &nbsp;chmoore]]>
   </description>
   <pubDate>Thu, 23 Aug 2012 02:25:02 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34500&amp;title=orman-building-demo#34500</guid>
  </item> 
  <item>
   <title>Orman Building Demo : &amp;#034;Still pretty high for 3...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34497&amp;title=orman-building-demo#34497</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=483">Bill</a><br /><strong>Subject:</strong> 4714<br /><strong>Posted:</strong> Aug&nbsp;22&nbsp;2012 at 9:25pm<br /><br />"Still pretty high for 3 days work."&nbsp; Spoken like someone who has never run a business.&nbsp; This kind of equipment costs big time money, plus the quick, emergency service premium as mentioned above.<DIV>&nbsp;</DIV><DIV>I wonder if the city got multiple bids and tried to negotiate.&nbsp; Guessing not.</DIV>]]>
   </description>
   <pubDate>Wed, 22 Aug 2012 21:25:51 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34497&amp;title=orman-building-demo#34497</guid>
  </item> 
  <item>
   <title>Orman Building Demo : Details......unless you do this...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34496&amp;title=orman-building-demo#34496</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=797">ground swat</a><br /><strong>Subject:</strong> 4714<br /><strong>Posted:</strong> Aug&nbsp;22&nbsp;2012 at 9:04pm<br /><br />Details......unless you do this for a living.&nbsp; It's expensive when you have to call on a emergency. Hauling/Dumping to clear it quickly costs $$. You want quick service you pay.&nbsp; This town doesn't know what pro-active means.&nbsp;&nbsp; ]]>
   </description>
   <pubDate>Wed, 22 Aug 2012 21:04:04 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34496&amp;title=orman-building-demo#34496</guid>
  </item> 
  <item>
   <title>Orman Building Demo :   Still pretty high for 3 days...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34494&amp;title=orman-building-demo#34494</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=1018">chmoore1</a><br /><strong>Subject:</strong> 4714<br /><strong>Posted:</strong> Aug&nbsp;22&nbsp;2012 at 6:45pm<br /><br />Still pretty high for 3 days work.&nbsp;&nbsp;&nbsp; chmoore]]>
   </description>
   <pubDate>Wed, 22 Aug 2012 18:45:11 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34494&amp;title=orman-building-demo#34494</guid>
  </item> 
  <item>
   <title>Orman Building Demo : Ms Judy stated at last nights...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34488&amp;title=orman-building-demo#34488</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=115">Vivian Moon</a><br /><strong>Subject:</strong> 4714<br /><strong>Posted:</strong> Aug&nbsp;22&nbsp;2012 at 10:59am<br /><br /><P style="MARGIN: 0in 0in 0pt" =Ms&#111;normal><SPAN style="FONT-FAMILY: 'Comic Sans MS'; COLOR: black; mso-bidi-font-family: Arial; mso-ansi-: EN" lang=EN><FONT size=3>Ms Judy stated at last nights council meeting that City Hall paid less than $50,000 for the demo of this small section of the Orman Building.</FONT></SPAN><SPAN style="FONT-FAMILY: 'Comic Sans MS'"><?: prefix = o ns = "urn:schemas-microsoft-com:office:office" /><o:p></o:p></SPAN></P>]]>
   </description>
   <pubDate>Wed, 22 Aug 2012 10:59:16 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34488&amp;title=orman-building-demo#34488</guid>
  </item> 
  <item>
   <title>Orman Building Demo :   In this round of demolition...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34457&amp;title=orman-building-demo#34457</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=259">409</a><br /><strong>Subject:</strong> 4714<br /><strong>Posted:</strong> Aug&nbsp;20&nbsp;2012 at 4:56pm<br /><br />In this round of demolition there was no debris disposal. With the exception of salvaging large wood beams, the debris was simply compacted with a bulldozer&nbsp;into the lower level. This section had wood beams instead of steel, similar to the old Sorg buildings. <div>This was posted above. (Bobcat carrying a large wood beam)</div><div><img src="uploads/259/IMG_2833.JPG" height="300" width="400" border="0" /></div>]]>
   </description>
   <pubDate>Mon, 20 Aug 2012 16:56:56 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34457&amp;title=orman-building-demo#34457</guid>
  </item> 
  <item>
   <title>Orman Building Demo : Were there no steel I beams to...</title>
   <link>http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34452&amp;title=orman-building-demo#34452</link>
   <description>
    <![CDATA[<strong>Author:</strong> <a href="http://www.middletownusa.com/forum/member_profile.asp?PF=4">John Beagle</a><br /><strong>Subject:</strong> 4714<br /><strong>Posted:</strong> Aug&nbsp;20&nbsp;2012 at 1:38pm<br /><br />Were there no steel I beams to be recycled?]]>
   </description>
   <pubDate>Mon, 20 Aug 2012 13:38:45 +0000</pubDate>
   <guid isPermaLink="true">http://www.middletownusa.com/forum/forum_posts.asp?TID=4714&amp;PID=34452&amp;title=orman-building-demo#34452</guid>
  </item> 
 </channel>
</rss>