Orman Building Demo

 Post Reply Post Reply Page  12>
Author
409 View Drop Down
Prominent MUSA Citizen
Prominent MUSA Citizen
Avatar

Joined: Mar 27 2009
Status: Offline
Points: 1014
Post Options Post Options   Thanks (0) Thanks(0)   Quote 409 Quote  Post ReplyReply Direct Link To This Post Topic: Orman Building Demo
    Posted: Aug 23 2012 at 11:05am
The hoe on the left is a Kobelco SK200. The Bobcat I referenced in an earlier post is actually a Mustang.
Back to Top
Mike_Presta View Drop Down
MUSA Council
MUSA Council
Avatar

Joined: Apr 20 2008
Location: United States
Status: Offline
Points: 3483
Post Options Post Options   Thanks (0) Thanks(0)   Quote Mike_Presta Quote  Post ReplyReply Direct Link To This Post Posted: Aug 23 2012 at 9:30am
Photo copied from 8/14/2012 Facebook post by W. Pence, showing both backhoes.
“Mulligan said he ... doesn’t believe they necessarily make the return on investment necessary to keep funding them.” …The Middletown Journal, January 30, 2012
Back to Top
Mike_Presta View Drop Down
MUSA Council
MUSA Council
Avatar

Joined: Apr 20 2008
Location: United States
Status: Offline
Points: 3483
Post Options Post Options   Thanks (0) Thanks(0)   Quote Mike_Presta Quote  Post ReplyReply Direct Link To This Post Posted: Aug 23 2012 at 8:59am

CHMoore,

Not to nit-pick or to start an argument, but just to clarify:

There were actually TWO backhoes working this project.  The large Caterpillar and a smaller hoe (I can’t recognize the make—see the picture on the left posted by 409 on14 Aug 2012 at 6:12pm).

I haven’t done any estimating since 1996 or ’97, but back then your hourly rate figure would’ve been too high for the smaller hoe, and maybe about right ($150 to 200, renting by the hour) for the big Cat).  Your guess for inflation since 1997 is as good as mine (and probably better, if you've been doing estimating since then).

Also, the big hoe (the Cat) used a hydraulic shear, not a bucket, part of the time.  There is an additional rental/equipment usage charge for shears and/or hydraulic rams that can run as high as 50% of the charge for the hoe.  (Hard to believe, I know, but it is true.)  This second hoe also means that another operator is needed.

Finally, to be fair to the City Manager, I recall her saying at the last council meeting that she wasn’t certain of the exact cost but was sure that it was LESS than $50,000.  Maybe it was way less???  Let’s wait and see—hopefully it will be less than $25,000.

 

“Mulligan said he ... doesn’t believe they necessarily make the return on investment necessary to keep funding them.” …The Middletown Journal, January 30, 2012
Back to Top
chmoore1 View Drop Down
MUSA Resident
MUSA Resident


Joined: Jan 25 2012
Status: Offline
Points: 230
Post Options Post Options   Thanks (0) Thanks(0)   Quote chmoore1 Quote  Post ReplyReply Direct Link To This Post Posted: Aug 23 2012 at 2:25am
Ground/Bill:  I have experience with "emergency" work.  First, this wasn't really "emergency work"---they had several days to line this up.  "Emergency" is, this water main broke and you need to respond within one hour, and stay on the job 24 hours a day until it is finished."  Whatever it takes.  Send me 10 men and let's go.  By photo evidence, it started on the morning of August 14th.  One hoe, one operator, one worker hosing the dust, and, perhaps, a third operating a front end loader.  Apparently, whatever wasn't reclaimed (large beams) was dropped in the basement and not hauled off.  Project was finished by 3:39, August 16th.  No evidence of overnight work.  So, hoe and operator at, say, $200.00/hr (hoe $125.00, operator $75.00/hr.)  X  24 (8 X 3 days)  equals $4,800.  24 hours labor for 2 other employees @ $50.00/hr. each equals $2,400.  Move-in, move-out, 4 hours (generous) @ $50.00/hr. equals $200.00.  Misc. materials (plastic protective fencing, etc.)  say, $2,000 to be generous equals $2,000.  Water for hosing, let's say $1,000 to be generous (water might even have been supplied by the city at no charge). Even if some disposal was involved, let's again be generous and say $5,000.  Let's see what we have: $4,800 + $2,400 + $200.00 + $2,000 + $1,000 + $5,000 = $15,400.  Yeah, that really gets close to $50,000 real fast.  Can you think of anything that was left out for $35,000?   Also, don't forget that the city has to have an agreement with a demolition company to respond to this type of project relatively quickly.  With as many buildings as the city has demolished recently, this should have been relatively routine.  Just for the sake of argument, let's up the equipment cost to $200/hr., up $75/hr. X  24 hours; add another $1,800.  Total, $17,200.    Uh, yeah, I did do project estimates for a number of years.     chmoore
Back to Top
Bill View Drop Down
MUSA Citizen
MUSA Citizen


Joined: Nov 04 2009
Status: Offline
Points: 710
Post Options Post Options   Thanks (0) Thanks(0)   Quote Bill Quote  Post ReplyReply Direct Link To This Post Posted: Aug 22 2012 at 9:25pm
"Still pretty high for 3 days work."  Spoken like someone who has never run a business.  This kind of equipment costs big time money, plus the quick, emergency service premium as mentioned above.
 
I wonder if the city got multiple bids and tried to negotiate.  Guessing not.
Back to Top
ground swat View Drop Down
MUSA Citizen
MUSA Citizen


Joined: Mar 31 2011
Status: Offline
Points: 367
Post Options Post Options   Thanks (0) Thanks(0)   Quote ground swat Quote  Post ReplyReply Direct Link To This Post Posted: Aug 22 2012 at 9:04pm
Details......unless you do this for a living.  It's expensive when you have to call on a emergency. Hauling/Dumping to clear it quickly costs $$. You want quick service you pay.  This town doesn't know what pro-active means.  
Back to Top
chmoore1 View Drop Down
MUSA Resident
MUSA Resident


Joined: Jan 25 2012
Status: Offline
Points: 230
Post Options Post Options   Thanks (0) Thanks(0)   Quote chmoore1 Quote  Post ReplyReply Direct Link To This Post Posted: Aug 22 2012 at 6:45pm
Still pretty high for 3 days work.    chmoore
Back to Top
Vivian Moon View Drop Down
MUSA Council
MUSA Council


Joined: May 16 2008
Location: Middletown, Ohi
Status: Offline
Points: 4187
Post Options Post Options   Thanks (0) Thanks(0)   Quote Vivian Moon Quote  Post ReplyReply Direct Link To This Post Posted: Aug 22 2012 at 10:59am

Ms Judy stated at last nights council meeting that City Hall paid less than $50,000 for the demo of this small section of the Orman Building.

Back to Top
409 View Drop Down
Prominent MUSA Citizen
Prominent MUSA Citizen
Avatar

Joined: Mar 27 2009
Status: Offline
Points: 1014
Post Options Post Options   Thanks (0) Thanks(0)   Quote 409 Quote  Post ReplyReply Direct Link To This Post Posted: Aug 20 2012 at 4:56pm
In this round of demolition there was no debris disposal. With the exception of salvaging large wood beams, the debris was simply compacted with a bulldozer into the lower level. This section had wood beams instead of steel, similar to the old Sorg buildings.
This was posted above. (Bobcat carrying a large wood beam)
Back to Top
John Beagle View Drop Down
MUSA Official
MUSA Official
Avatar

Joined: Apr 23 2007
Location: Middletown
Status: Offline
Points: 1855
Post Options Post Options   Thanks (0) Thanks(0)   Quote John Beagle Quote  Post ReplyReply Direct Link To This Post Posted: Aug 20 2012 at 1:38pm
Were there no steel I beams to be recycled?
John Beagle

Middletown USA

News of, for and by the people of Middletown, Ohio.
Back to Top
chmoore1 View Drop Down
MUSA Resident
MUSA Resident


Joined: Jan 25 2012
Status: Offline
Points: 230
Post Options Post Options   Thanks (0) Thanks(0)   Quote chmoore1 Quote  Post ReplyReply Direct Link To This Post Posted: Aug 20 2012 at 12:44pm
lrisner:  I agree that disposal is costly, but that isn't over $50,000 of disposal material.   chmoore
Back to Top
lrisner View Drop Down
MUSA Citizen
MUSA Citizen
Avatar

Joined: May 26 2009
Status: Offline
Points: 330
Post Options Post Options   Thanks (0) Thanks(0)   Quote lrisner Quote  Post ReplyReply Direct Link To This Post Posted: Aug 20 2012 at 4:04am
Have any of you paid for disposal lately? I paid  $875 for disposal of just a 1 1/2 car garage that my brothers and i tore down. Having the ability to get rid of the debris is where the cost/profit comes in.











Back to Top
VietVet View Drop Down
MUSA Council
MUSA Council
Avatar

Joined: May 15 2008
Status: Offline
Points: 7008
Post Options Post Options   Thanks (0) Thanks(0)   Quote VietVet Quote  Post ReplyReply Direct Link To This Post Posted: Aug 19 2012 at 8:51am
How about the MMF'ers giving the city back the $75,000 to pay for this? They're high rollers. They claim they care about the city, right? I'm sure they wouldn't mind footing the bill out of their own pockets, would they?
Back to Top
chmoore1 View Drop Down
MUSA Resident
MUSA Resident


Joined: Jan 25 2012
Status: Offline
Points: 230
Post Options Post Options   Thanks (0) Thanks(0)   Quote chmoore1 Quote  Post ReplyReply Direct Link To This Post Posted: Aug 19 2012 at 2:55am
Well, wasn't that cozy?   Up to $75,000.  Our pictorial log started (above) on August 14th---Tuesday---and was broom clean by 3:39 Thursday, August 16th.  Three days, one hoe/operator, debris removal, one guy hosing the area, three sidewalk superintendents.  Not bad for $25,000 a day.   How many bids did they have, again?    chmoore
Back to Top
Vivian Moon View Drop Down
MUSA Council
MUSA Council


Joined: May 16 2008
Location: Middletown, Ohi
Status: Offline
Points: 4187
Post Options Post Options   Thanks (0) Thanks(0)   Quote Vivian Moon Quote  Post ReplyReply Direct Link To This Post Posted: Aug 19 2012 at 2:38am
CORRECTION
I drove past the building and realized that only a small section had been removed so I email Russ Carlos and requested the cost of this demo.
The city paid upto $75,000 for this demo to be paid from the dowtown fund.
Back to Top
409 View Drop Down
Prominent MUSA Citizen
Prominent MUSA Citizen
Avatar

Joined: Mar 27 2009
Status: Offline
Points: 1014
Post Options Post Options   Thanks (0) Thanks(0)   Quote 409 Quote  Post ReplyReply Direct Link To This Post Posted: Aug 17 2012 at 1:22pm
Originally posted by Vivian Moon Vivian Moon wrote:

409
I believe this demo will cost the city between $225,000 and $300,000.
For less than 3 days work + some planning !
I've been in the wrong business !!!
Back to Top
Bocephus View Drop Down
MUSA Citizen
MUSA Citizen
Avatar

Joined: Jun 04 2009
Status: Offline
Points: 838
Post Options Post Options   Thanks (0) Thanks(0)   Quote Bocephus Quote  Post ReplyReply Direct Link To This Post Posted: Aug 17 2012 at 1:00pm
Originally posted by Vivian Moon Vivian Moon wrote:

409
I believe this demo will cost the city between $225,000 and $300,000.
 
thats crazy
 
Back to Top
Vivian Moon View Drop Down
MUSA Council
MUSA Council


Joined: May 16 2008
Location: Middletown, Ohi
Status: Offline
Points: 4187
Post Options Post Options   Thanks (0) Thanks(0)   Quote Vivian Moon Quote  Post ReplyReply Direct Link To This Post Posted: Aug 17 2012 at 12:56pm
409
I believe this demo will cost the city between $225,000 and $300,000.
Back to Top
409 View Drop Down
Prominent MUSA Citizen
Prominent MUSA Citizen
Avatar

Joined: Mar 27 2009
Status: Offline
Points: 1014
Post Options Post Options   Thanks (0) Thanks(0)   Quote 409 Quote  Post ReplyReply Direct Link To This Post Posted: Aug 16 2012 at 3:39pm
Thanx John!
This is the finished product for now.
Wonder what the price tag was for this?
 
Back to Top
John Beagle View Drop Down
MUSA Official
MUSA Official
Avatar

Joined: Apr 23 2007
Location: Middletown
Status: Offline
Points: 1855
Post Options Post Options   Thanks (0) Thanks(0)   Quote John Beagle Quote  Post ReplyReply Direct Link To This Post Posted: Aug 16 2012 at 2:51pm
Great photos!

Originally posted by 409 409 wrote:



Talked to one of the guys & he said there was no asbestos in that side of the building.
 
 
This is as far back as they are going to go for now.
 
John Beagle

Middletown USA

News of, for and by the people of Middletown, Ohio.
Back to Top
Mike_Presta View Drop Down
MUSA Council
MUSA Council
Avatar

Joined: Apr 20 2008
Location: United States
Status: Offline
Points: 3483
Post Options Post Options   Thanks (0) Thanks(0)   Quote Mike_Presta Quote  Post ReplyReply Direct Link To This Post Posted: Aug 15 2012 at 9:30pm
Originally posted by 409 409 wrote:

Talked to one of the guys & he said there was no asbestos in that side of the building.
Then what they did (quickly demolishing this one wing of the building nearest the RR track that was in danger of collapsing) was the correct call...better than shoring up the wall (as was indicated they were going to do at the last council meeting) and better than offloading the shipment and trucking it the last few blocks (as I had suggested).
“Mulligan said he ... doesn’t believe they necessarily make the return on investment necessary to keep funding them.” …The Middletown Journal, January 30, 2012
Back to Top
409 View Drop Down
Prominent MUSA Citizen
Prominent MUSA Citizen
Avatar

Joined: Mar 27 2009
Status: Offline
Points: 1014
Post Options Post Options   Thanks (0) Thanks(0)   Quote 409 Quote  Post ReplyReply Direct Link To This Post Posted: Aug 15 2012 at 7:22pm
Talked to one of the guys & he said there was no asbestos in that side of the building.
 
 
This is as far back as they are going to go for now.
 
Back to Top
VietVet View Drop Down
MUSA Council
MUSA Council
Avatar

Joined: May 15 2008
Status: Offline
Points: 7008
Post Options Post Options   Thanks (0) Thanks(0)   Quote VietVet Quote  Post ReplyReply Direct Link To This Post Posted: Aug 15 2012 at 6:28am
Originally posted by Bocephus Bocephus wrote:

I could just imagine the fines that they would invoke on this city I pray thats not the case.


Could happen again in this town Bo. Back when they attempted Lake Middletown, someone in the city building (we never knew who made the decision), approved the removal of the temporary dam that separated the lake from the Great Miami River BEFORE the Army Corps Of Engineers told the city they could remove it, and the city paid a $300,000+ fine for allowing silt to be released into the river. Part of the track record this city has accululated for botched projects. If a project has disaster written all over it, look no further than the city building for the culprits.
Back to Top
chmoore1 View Drop Down
MUSA Resident
MUSA Resident


Joined: Jan 25 2012
Status: Offline
Points: 230
Post Options Post Options   Thanks (0) Thanks(0)   Quote chmoore1 Quote  Post ReplyReply Direct Link To This Post Posted: Aug 15 2012 at 12:57am
Asbestos?  I don't see no stinking asbestos.      chmoore
Back to Top
Bocephus View Drop Down
MUSA Citizen
MUSA Citizen
Avatar

Joined: Jun 04 2009
Status: Offline
Points: 838
Post Options Post Options   Thanks (0) Thanks(0)   Quote Bocephus Quote  Post ReplyReply Direct Link To This Post Posted: Aug 15 2012 at 12:09am
I could just imagine the fines that they would invoke on this city I pray thats not the case.
Back to Top
 Post Reply Post Reply Page  12>
  Share Topic   

Forum Jump Forum Permissions View Drop Down



This page was generated in 0.102 seconds.
Copyright ©2024 MiddletownUSA.com    Privacy Statement  |   Terms of Use  |   Site by Xponex Media  |   Advertising Information